Your facilities contract is expiring. What should you review before renewing?

A practical review of scope, performance, costs and handover before a facilities contract renewal.

Illustration of two facilities colleagues reviewing a contract beside a residential courtyard.

The renewal reminder arrives. The contractor has been familiar, the building has stayed open and the new price is in your inbox. Is that enough to sign for another term?

Sometimes renewal is exactly the right decision. But a contract that suited the building two years ago may not reflect today’s assets, access arrangements or expectations. Before comparing the new price, establish what the property needs, what the current agreement actually covers and which issues remain open.

Begin with the decision date, not the expiry date

Find the signed agreement and any variations. Note the end date, the notice or extension provisions, who can approve a renewal and the time needed for a transition if the provider changes. Follow the contract and your organisation’s purchasing rules; do not assume that every agreement has the same notice period.

Work backwards from the earliest decision you must make. A realistic plan leaves room to assemble records, discuss scope with the incumbent, obtain any required quotations and take the proposal through approval. A reminder is useful only if the right people have time to act on it.

Singapore’s Building and Construction Authority guide on FM procurement recommends allowing for mobilisation when a new provider takes over, including time to understand site issues and establish documentation. Treat that as guidance to adapt to the contract and building, not a universal deadline.

Ask what changed in the building

Put the current scope beside the actual site. Have assets been added, replaced or removed? Did operating hours, occupancy, access rules or the space covered by the agreement change? An old equipment list can leave the team arguing later over whether a newly installed pump was included.

Check the practical boundaries: scheduled work and call-outs, parts and consumables, reporting, safety and access arrangements, after-hours attendance, and who coordinates specialist work. If the answer is “it depends”, write down what it depends on and ask the provider to clarify.

Avoid treating a generic maintenance frequency as a servicing instruction. Equipment manuals, relevant legal requirements, the contract and qualified advice all matter for the actual assets involved.

Read the service record with the team

A monthly report may say every visit happened. The site team may remember repeated callbacks, unclear reports or delayed access approvals. Both perspectives matter. Bring the contract, completed service records, outstanding defects, complaints, quotations and exceptions into the same review.

Ask what the agreed service measures actually mean. A response target can measure the time to acknowledge a fault, attend the site or restore service; those are different things. Compare performance with the wording of the agreement and note where information is missing.

Also distinguish the provider’s work from dependencies on the buyer. Was a repair delayed because a contractor did not attend, a part was unavailable, an approval was outstanding, or the site could not provide access? A fair review should make that distinction before anyone draws a conclusion.

The NEA’s outcome-based contracting guidance describes specifying desired service outcomes and quality for cleaning contracts. Its cleaning-contract guide discusses end-of-term review and lessons learned. Apply the principle to your own contract where appropriate; cleaning guidance is not a substitute for technical maintenance requirements.

Compare the whole proposal, not just the headline fee

An illustrative example: one quote includes planned servicing and emergency attendance but excludes replacement parts. Another includes a parts allowance with conditions. The lower annual fee does not by itself show which offers better value.

Ask each provider to identify the same essentials: scope and exclusions, assumptions, response arrangements, price changes, extras, reporting, and what happens when the work falls outside the agreement. If two quotes cover different things, ask for clarification before treating them as comparable. Record the unanswered questions rather than filling the gaps with guesses.

Scope: Are the same sites, assets and service hours covered?

Performance: What was agreed, what happened, and what remains unresolved?

Price: What is included, excluded or subject to a separate charge?

Risk: Who handles access, emergencies, specialist work and approvals?

Continuity: What records and open work must carry into the next term?

This worksheet is a starting point. Your contract, procurement policy and professional advice govern the decision.

If you change provider, protect the handover

List open defects, upcoming planned work, asset and service records, applicable warranties, contact and escalation arrangements, and who owns each next action. Agree what the outgoing and incoming providers must hand over under the contract, who checks the information and what happens if a record is missing.

A signed new agreement does not finish the transition. Confirm who is covering the property on the changeover date, how urgent issues will be escalated and how the first weeks of service will be reviewed. Keep restricted records and access credentials under the organisation’s security controls; do not circulate them in a general handover pack.

Make the approval easier to review

Give the approver a concise decision pack: the current agreement and expiry, proposed scope, performance evidence, comparable prices, material exclusions, open risks, recommendation and the decision needed. State who checked the information and when. If an important issue is unresolved, say so.

Wisbid’s contracts and vendor tools are presented as a way to keep contract terms, renewal dates, quotations and supporting records together for review. Your team remains responsible for checking current evidence, selecting providers and approving the commitment. If you already use another system, bring one upcoming renewal to a discussion and ask how the work would fit your existing process.

Source guidance checked 13 November 2026. This is general operational information, not legal advice; confirm the terms and requirements that apply to your property.