An inspection can be complete while a defect it found is still unresolved. Keep the finding linked to the inspection, give the corrective work an owner and check the outcome before treating the issue as closed. If there is immediate danger, follow your site's emergency procedure rather than waiting for an administrative workflow.

An example: a loose overhead fitting
Imagine an inspector notices a loose overhead fitting in a lobby. This is an illustrative example, not a real Wisbid case. Notify the responsible site team and follow its safety procedures. A suitably qualified person should assess the situation and determine the necessary controls and repair; do not use this article as a repair instruction.
1. Record what was observed
Keep the inspection date, asset or fitting reference, exact location, the observation and the person reporting it. Add a photo only if it is safe to take one. Separate what is known from what still needs investigation, and link the finding back to the original inspection record.
2. Assign the follow-up
Have the responsible person decide the urgency, interim controls and next action using the site's procedures and competent advice. Record the repair scope, owner, required approvals and target date. If the repair is tracked separately, retain its connection to the inspection; completing the inspection does not itself complete the repair.
3. Review the result
When work is reported complete, compare the service notes and any appropriate evidence with the agreed scope. Record who reviewed the result and whether it was accepted. If work remains or the evidence is insufficient, keep a named owner and next action for the unresolved item rather than closing it silently.
Use the right technical reference
The BCA good-practice guide for building fixtures includes maintenance checklists that refer to previous problems and rectification records. Its scope is building fixtures; it does not replace the manufacturer's instructions, applicable requirements or advice for your particular equipment.
Put the handoff into practice
Wisbid's maintenance page describes work orders, asset history, checklists and closure evidence. Ask for a demonstration using an anonymised inspection and follow-up so you can check how the workflow fits your team. For the broader process, see the preventive maintenance plan and work order checklist.
Does completing the inspection close the defect?
Not necessarily. Record the inspection's completion separately from the corrective work and its acceptance, according to your site's process.